Fairway Residence
Plot 94, Road 301, Sector 3, Jolshiri Abashon, Rupganj, Narayanganj
8 homes of 2,750 to 2,783 sft in Sector 3, Jolshiri Abashon. Handing over May 2028.
Fairway Residence is a nine storey building of 8 homes on Road 301 in Sector 3, Jolshiri Abashon. Flats run from 2,750 to 2,783 sft with 4 bedrooms, few enough to a floor that the lobby never feels like a corridor.
Jolshiri Abashon is a planned township in Rupganj, laid out sector by sector with the roads, drains, water and gas lines put in before the buildings. That order is the whole point. The road in front of your gate is not dug up two years after you move in, the sector park is a walk rather than a drive, and the boundary is managed, so the traffic on your road is the traffic of the people who live on it.
The building is designed to the Bangladesh National Building Code and approved by RAJUK, engineered for the local seismic zone, with a soil test taken on this plot rather than borrowed from next door. Elysium keeps a quality checklist that is signed off before every casting by someone who does not report to the site team, and the handover month is written into the sale agreement rather than left to a conversation.
Construction is 12 percent complete and the sale agreement carries a May 2028 handover. 5 of the 8 units are open, from 2,34,00,000 Taka with a booking amount of 11,70,000 Taka. Twelve, twenty four and thirty six month plans are all available at this stage. Come to the site on a Friday or Saturday morning and walk the floor you are considering.
At a glance
The whole specification of the building, as it is filed with the approval.
- Address
- Plot 94, Road 301, Sector 3, Jolshiri Abashon, Rupganj, Narayanganj
- Type
- Residential
- Land area
- 5 Katha
- Levels
- 9 Storied (G+Mezzanine+8)
- Apartment size
- 2,750 to 2,783 sft
- Units per level
- 1
- Units
- 8
- Parking
- 8
- Elevators
- 1
- Staircase
- 1, with Fire Door
- Bedrooms
- 4
- Handover
- May 2028
- Design consultant
- VOLUMEZERO Limited
Project progress
Five stages from the first pile to the day you get the keys.
12% complete
Handover May 2028
- Piling12%
- Structure
- Brickwork
- Finishing
- Handover
Measured on site in September 2026. Handover May 2028, and that month is in the sale agreement.
Features and amenities
All 7 of these are in the build specification and come with the building.
- LobbyDouble-Height Entrance
- Roof spaceRooftop Seating Arrangement
- Single-Unit Apartment
- Multipurpose Room
- Exquisite Reception
- Lavish Green Area
- GardenRooftop Landscaping
Floor plans
How a level is laid out around the lift and stair core, drawn from the sizes in the specification.
Drag or swipe the plan sideways to see all of it.
Typical layout drawn from the listing's sizes, not an architectural plan.
Where it is
The neighbourhood, and how long the everyday places take.
Nearby
- School7 minutes on foot
- Sector market5 minutes on foot
- Mosque4 minutes on foot
- Hospital18 minutes by car
- 300 Feet Expressway9 minutes by car
Walking and driving times are approximate, measured from the plot gate.
Open in Google MapsPayment plans
Pick a plan and change the down payment to see the real monthly figure.
| Plan | Down | On signing | Every month |
|---|---|---|---|
| 12 months | 30% | ৳58,50,000 | ৳13,65,000 |
| 24 months | 25% | ৳46,80,000 | ৳7,31,250 |
| 36 months | 20% | ৳35,10,000 | ৳5,20,000 |
Booking amount ৳11,70,000, paid once, counted against the price.
Why you can trust this one
Four things you are handed on paper.
- RAJUK approved plan
- BNBC compliant design
- Written handover date in the sale agreement
- Progress 12% as of September 2026
Come and stand on the site before you decide. Tell us a day and our nearest site office will take you round.
Ask about Fairway Residence
Leave your number and our sales desk calls you back. Sales desk open 9 am to 8 pm, seven days.
Or reach us now
Jolshiri site office
Sector 16, Jolshiri Abashon, Rupganj, Narayanganj