Block J, Plot 519
Plot 519, Road 8, Block J, Bashundhara R/A, Dhaka 1229
Five katha on Road 8, Block J. All ten shares taken, finishing work starts this winter, handover December 2028.
- Home size
- 1,650 sft
- 3 bedrooms
- Shares left
- 0 of 10
- join the waitlist
- Keys
- Dec 2028
- date in your agreement
- To book
- ৳2.6 Lakh
- part of the price
Why you can trust this one
- Soil test taken on this plot
- BNBC compliant design
- Written handover date in the sale agreement
- Registered share deed and mutation in the buyer's name
Plot 519 was the first Bashundhara plot we opened for shares and it sold out in under three months. Five katha on Road 8 in Block J, ten shares, one 1650 sft flat per floor. The structure is complete, the lift shaft is in, and finishing work begins this winter for a December 2028 handover.
Read the full description
It is on the site because it answers the question every new buyer asks, which is whether the model actually reaches handover. Ten families own registered land here, each mutation is done, and the building is seventy percent through. When it hands over, the ten shareholders will hold both a land deed and a flat deed in Bashundhara, bought at 2026 land prices.
If you want the same thing, Block N Plot 6427 and Block M Plot 1503 are open now. Join the waitlist here and we will also call you first if a shareholder at Plot 519 transfers a share before handover.
At a glance
The key facts, in one place.
- Address
- Plot 519, Road 8, Block J, Bashundhara R/A, Dhaka 1229
- Type
- Residential
- Land
- 5 Katha
- Floors
- 10 Storied
- Flat size
- 1,650 sft per share
- Flats per floor
- 1
- Shares
- 10 shares
- Parking
- 10
- Elevators
- 1
- Bedrooms
- 3
- Keys
- December 2028
- Architect
- RAJUK enlisted consultant
How the land is shared
The land is divided into 10 equal shares. Each share is registered in its owner's name and comes with one flat.
What you get with one share
- A registered undivided share of the land in your own name
- Mutation and the up to date land tax record in your name
- One completed flat on the floor allotted to your share
- One dedicated car parking space
- Gas, water, electricity and lift connections live at handover
- The approved plan, the completion certificate and the handover checklist
How your share is registered in your name
- Visit the plot and read the title file with our legal team
- Reserve your share with the booking amount and pick a payment plan
- Sign the share deed and the development agreement, mutation follows
- Elysium designs, approves, funds and builds while you pay in instalments
- Take handover of your flat with your deed, parking and connections
The building
A ten storey residential building with one 1650 sft flat on each floor, one flat for each share.
Keys expected December 2028. The date is written into your agreement.
Timeline
Where the building is now, from foundations to keys.
70% complete
Handover December 2028
- Piling
- Structure
- Brickwork
- Finishing70%
- Handover
Measured on site in September 2026. Handover December 2028, and that month is in the sale agreement.
Features and amenities
All of these come with the building.
- Power backupStandby generator with full power backup
- LiftPassenger lift with rescue device
- SubstationSubstation and dedicated meter for every flat
- IntercomIntercom from the flat to the main gate
- CCTVCCTV on the entrance, lobby, lift and parking
- Water reservoirUnderground and overhead water reservoir
- Fire safetyFire extinguishers and a smoke detection system
- SecurityGuard post with a dedicated caretaker room
- Community spaceCommunity space on the roof with a water tap and lighting
- RainwaterRainwater drainage and a sewage connection to the sector line
Floor plans
How each floor is laid out.
Drag or swipe the plan sideways to see all of it.
Typical layout drawn from the listing's sizes, not an architectural plan.
Gallery
3 pictures. Tap any one to see it full size.
Artist's impressions of the finished building, not photographs.
Sample listing. Photos and figures are shown for demonstration.
Where it is
Where it is, and how far the everyday places are.
Nearby
- School6 minutes on foot
- Block market4 minutes on foot
- Mosque3 minutes on foot
- Hospital9 minutes by car
- Kuril flyover12 minutes by car
Walking and driving times are approximate, measured from the plot gate.
Payment plans
Choose how many months, and see what you pay each month.
| Plan | Down | On signing | Every month |
|---|---|---|---|
| 12 months | 30% | ৳12,70,000 | ৳2,97,500 |
| 24 months | 25% | ৳10,15,000 | ৳1,59,375 |
| 36 months | 20% | ৳7,60,000 | ৳1,13,333 |
| 48 months | 15% | ৳5,05,000 | ৳90,312 |
You book with ৳2.6 Lakh, paid once and taken off the price.
Common questions
What buyers ask us most.
Is the land registered in my name?
Yes. Your share of Block J, Plot 519 is registered in your name as an undivided share of the plot. The deed is signed at the sub registry office in your name, and Elysium pays the registration cost of the share deed as part of the price you see here.
What about mutation and the land tax record?
Mutation is included. After registration our legal team files the mutation in your name at the AC Land office and hands you the khatian and the DCR. From that point the land tax receipt comes in your name every year, and we remind you when it is due.
What happens if another shareholder stops paying?
Nothing happens to your share. Each share is a separate deed and a separate payment plan, so one shareholder falling behind does not touch your title or your flat. If someone cannot continue, Elysium buys the share back at the price already paid or transfers it to a new buyer, and the construction schedule stays as it is.
Can I sell my share before the building is finished?
Yes. A share can be transferred once the share deed is registered and your instalments are current. You find the buyer or we help you find one, the balance of your plan moves to the new owner, and Elysium charges a flat transfer fee of 50,000 Taka for the paperwork.
How long does construction take?
Block J, Plot 519 is planned as a ten storey residential building with one 1650 sft flat on each floor, one flat for each share. Piling and foundation take about ten months, the structure about fourteen, and finishing about twelve. The handover month is December 2028, and it is written into the development agreement you sign.
Who pays for the development?
Elysium does. The price of your share covers the land only. Design, approval, piling, construction, lift, generator, substation and finishing are all funded by Elysium under the development agreement you sign at the same time as the share deed. You pay for the land and you receive a finished flat.
Do I get car parking?
Yes. One dedicated car parking space comes with every share at Block J, Plot 519, allotted by draw before handover and written into your allotment letter. Visitor parking is separate and stays common to the building.
What exactly do I receive at handover?
One completed 1650 sft flat, your registered share of the land, one car parking space, and the utility connections. Gas, water, electricity and lift are commissioned before handover, and you get the deed of the flat, the approved plan, the completion certificate and the handover checklist on the same day.
See it before you decide
Tell us a day and we will show you the site.
Also worth seeing
7 available
Only 3 left
51 available
Only 5 left







